Home inspection & KA

Home inspection, building control (KA) and radon testing in Vingåker

Technical consultants and inspection firms with verified assignments in Vingåker municipality: pre-purchase surveys and energy certificates for house sales, certified building control officers (KA), geotechnics and blasting surveys, plus accredited radon measurement.

Detail of a red timber facade and window trim on a heritage building in Vingåker municipality.
Archive photo from Vingåker, spring 2020. Buying, extending or carrying out groundworks often requires both a technical inspection and an inspection plan.

ÄC-Konsult is a Verified Partner in West Sörmland offering fixed-price building control (KA level N), geotechnical surveys, damage investigations and pre- and post-inspections for blasting or groundworks across Vingåker municipality.

For pre-purchase inspections and energy certificates, FST Husbesiktningar and Husbesiktning Nerike have documented reports on properties in Vingåker, Viala and Läppe. For home radon testing, the municipality refers homeowners to accredited laboratories during the heating season from 1 October to 30 April.

The information on this page was checked on 21 November 2026.

Decision guide

Choose what applies to you. The list shows businesses whose details we have checked against a named source.

Filter the list

What do you need help with?

Local selection

Showing 5 of 5 verified options

Katrineholm, serving all of Vingåker municipality and western Sörmland

Verified Partner in West Sörmland

ÄC-Konsult

Katrineholm (möte efter överenskommelse)

Road 52 between the towns. The company estimates the journey at 15–20 minutes, which is not a general travel time to every property.

Certified building control officer (KA) under the Planning and Building Act at a fixed price, geotechnical surveys and foundation design. For blasting, piling and sheet piling: risk analysis, pre-inspection, vibration monitoring and post-inspection. Damage investigations of settlement, cracks and moisture, and technical reports for insurers and property owners.

Limited company since 1984. The head office is at Nygatan 33 A in Eskilstuna. The company has a certified building control officer (KA) at level N for projects of a normal nature, with certificate SC2326-12 from RISE valid until 5 March 2028 according to the company. The Vingåker page names Läppe, Högsjö, Baggetorp, Marmorbyn and Österåker, among other places. For foundation reinforcement, the documented role is investigating and designing the measures.

Good to know

Send the property designation, drawings and the council’s decision on a KA. Before groundworks next to a neighbouring building, the pre-inspection needs to be booked before work starts.

Opening hours and booking
Call the switchboard on 016-51 74 00 or email info@ac-konsult.se for a meeting in Katrineholm or at the property. A building control officer (KA) is booked via the switchboard or the direct line 070-537 60 36. Bookings: 073-769 02 20. Structural design and inspection: 076-772 96 80.
Price
Fixed price for KA after a review of the project. The guide range is SEK 10,000–40,000: about SEK 10,000–15,000 for smaller projects, SEK 15,000–25,000 for an extension and SEK 25,000–40,000 for a new detached house. Scope and number of visits affect the quote.

Source: ÄC-Konsult i Vingåker, checked 21 November 2026

Vingåker municipality, regional office in Nyköping

FST Husbesiktningar

Högbrunnsvägen 2B, 611 38 Nyköping

Pre-purchase inspections and energy performance certificates.

The company’s report for Viala Bergslyckan shows an inspection in the municipality. For Snickaregatan 24 in Vingåker, FST issued energy performance certificate 1615386 on 5 May 2025.

Good to know

State whether you need an inspection report, an energy performance certificate or both. For Snickaregatan, radon measurement is recorded as not carried out, so ask about radon separately.

Opening hours and booking
Book via the switchboard on 010-495 24 40 or husbesiktningar@fst-ab.com.
Price
Ask for a price for each document and any extras.

Source: FST Husbesiktningar, regionkontor, checked 21 November 2026

Örebro, documented inspection in Läppe

Husbesiktning Nerike AB

Hemmansvägen 10, 702 17 Örebro

Pre-purchase inspections, moisture testing and energy performance certificates.

The inspection firm carried out the pre-purchase inspection for Vingåker Stavhälla 3:23 in Läppe on 23 February 2026. The SBR member register confirms the address and the moisture and energy services.

Good to know

Ask whether moisture testing should be part of your assignment and which spaces will be accessible during the visit.

Opening hours and booking
Book by phone on 070-995 20 82. Contact details are also listed in the company’s SBR profile.
Price
Ask for a quote for the property and any extras.

Source: SBR, medlemsuppgifter för Husbesiktning Nerike, checked 21 November 2026

Serves Vingåker, contact office in Stockholm

Besiktningsförrättare Sverige AB

Stockholm (besöksadress saknas)

Building control (KA), inspection plans, technical consultations and site visits.

The company has a dedicated page for KA assignments in Vingåker and states that it is certified. A named KA with a certificate number for an individual assignment has not been verified. The contact page and map link give different PO box numbers.

Good to know

Ask for the name, certification level, certificate and number of site visits in the quote.

Opening hours and booking
Call 076-555 52 23 or use the quote form on the website.
Price
Individual quote based on project size and number of visits.

Source: Besiktningsförrättare Sverige, KA i Vingåker, checked 21 November 2026

Home testing in Vingåker municipality, laboratory in Uppsala

Radonova Laboratories AB

Södra Depågatan 2, 754 54 Uppsala

Radon detectors for home measurement and laboratory analysis.

Vingåker municipality refers homeowners to accredited measurement laboratories. Radonova offers this kind of remote measurement, in which the homeowner places the detectors.

Good to know

For a long-term measurement, the municipality specifies at least two months between 1 October and 30 April.

Opening hours and booking
Order online. Customer service 018-56 88 00, Mon–Thu 09:00–12:00 and 13:00–15:00, Fri 09:00–12:00. A contact form is available.
Price
The product page shows SEK 1,095 but gives a different starting price in an answer text. Check the current package price when ordering.

Source: Radonova, villamätning av radon, checked 21 November 2026

Local guidance & checked sources

Ask the Vingåker Guide

Pick a question or search across checked local data in Vingåker municipality. The answer opens directly in the side panel.

In depth

Good to know before booking

The difference between a pre-purchase inspection and a building control officer (KA)

A pre-purchase inspection is carried out when a house changes hands to document the condition of the building and any risk constructions. An energy performance certificate shows the building’s energy use and is normally required when a house is sold.

A building control officer (KA under the Planning and Building Act, PBL) is required when building new, extending or altering load-bearing structures. The KA drafts the inspection plan, attends the technical consultation with the municipality and issues a statement for final approval.

Ground conditions, foundations and blasting in West Sörmland

Ground conditions in Vingåker vary between clay in the valleys and bedrock or till near the lakes in Läppe, Högsjö and Marmorbyn. For new builds or settlement damage, a geotechnical survey may be needed before designing the foundation.

If blasting, piling or excavation will take place close to existing buildings, a pre-inspection and vibration monitoring protect both the developer and neighbours by documenting the condition before and after the work.

Planning a radon test when buying or selling a house

A reliable annual average for radon requires a long-term measurement of at least two months during the heating season from 1 October to 30 April. On energy certificates in the municipality, radon is often listed as not measured unless the owner ordered a separate test.

If a house purchase takes place in summer or with a short completion period, a short-term test can give an advisory indication, though it does not replace a winter long-term measurement.

Frequently asked questions

When in the building permit process do I need to appoint a KA?

You normally need to name your certified building control officer in the building permit application or notification. Construction may not begin until the technical consultation has taken place and the municipality has issued a start clearance.

What does a building control officer (KA) cost for a house or extension in Vingåker?

ÄC-Konsult quotes a fixed price after reviewing the project, with a guide range of SEK 10,000–15,000 for smaller projects, SEK 15,000–25,000 for an extension and SEK 25,000–40,000 for a new detached house.

Is radon testing automatically included in an energy performance certificate?

No. An energy performance certificate only records a radon figure if a measurement has already been carried out in the house. Otherwise you need to order detectors separately from an accredited laboratory.

Can I hire the same consultant for a pre-inspection before groundworks or blasting?

Yes. ÄC-Konsult carries out risk analysis, pre-inspection of neighbouring buildings, vibration monitoring and post-inspection in Vingåker municipality. Book before the contractor begins excavating or blasting.